Pumping station – “ŠTRAND”

GraditeljNS 2:10 pm

Basic information about building:

  • THE LOCATION: Liman, Novi Sad
  • THE PUMP CAPACITY: Q = 1.500 l/sec
  • THE CONSTRUCTION YEAR: 2007/2008 year
  • THE EMPLOYER: PUC “Waterworks and sewerage system”, Novi Sad

Construction phases: