“The health centre” – Futog

GraditeljNS 2:50 pm

Basic information about building:

  • THE LOCATION: Futog
  • THE SURFACE OF THE OBJECT: 1.200 m2
  • THE CONSTRUCTION YEAR: 2011/2012 god.
  • THE EMPLOYER: “The health centre”, Novi Sad

Construction phases: