The capacities

  • THE OPTIMAL ANNUAL INSTALLATION: 30.000m/year
  • THE OPTIMAL ANNUAL
    PUMP FACILITIES INSTALLATION: 15-20pieces/year
  • THE SEWAGE NETWORK CONSTRUCTION: 80.000m/year

The construction of the water-supply and
sewerage systems in the municipalities of:

  • Novi Sad, Apatin, Sombor, Zrenjanin, Bačka Palanka,
  • Pančevo, Vrbas, Bečej, Inđija, Kikinda, Bač,
  • Futog, Rumenka, Kać, Begeč, Ledinci, Čenej,
  • Maglić, Pećinci, Subotište, Irig, Kulpin …

Construction of Collector II, Collector VII and Central main pipeline

  • LOCATION: Subotica
  • PROJECT: Subotica Water Upgrade Project 1 “Construction of Collector II, Collector VII and Central main pipeline, Subotica”
    • PIPES USED:
    • Ductile pipes Ø 1600mm/1400mm/300mm/250mm
    • Polyester pipes: Ø 1600mm/1400mm/900mm/700mm/500mm
    • PVC pipes Ø 400mm/315mm
  • THE PROJECT ROUTE LENGTH:
    • Sewerage Collector ~ 3.700m
    • Central main pipeline ~ 2.700m
  • CONSTRUCTION YEAR: 2015 god.
  • EMPLOYER: PUC “Vodovod i Kanalizacija”, Subotica / EBRD Loan