CONSTRUCTION WORKS OF THE SEWERAGE IN ŽITIŠTE ACCORDING TO THE “TURN-KEY” SYSTEM
BASIC INFORMATION ABOUT BUILDING:
October 2016
Work Execution: construction of the sewerage of used waters PVC DN315, SDR41, SN4 in the length L = 1,100.0 m and PVC DN250, SDR41, SN4 in the length L = 23,500.0 m.
The subject of the works is the construction of 4 pumping stations on the sewarage line of used waters.