CONSTRUCTION OF NGC1- NEW MAIN PUMPING STATION NEAR ŽEŽEL’S BRIDGE (PHASE I) WITH ACCOMPANYING FACILITIES- TRANSFORMER STATION AND CONTROL COMMAND CENTER

BASIC INFORMATION ABOUT BUILDING:
  • Site Location:   The NGC-1 Pumping Station Facility occupies a position at the very corner of Marko Miljanov Street and Belgrade Quay, at a distance of approx. 10.0 m from the regulation line; the Transformer Station is located next to the main building NGC-1, at a distance of 3.80 m; control and command center is located along the Belgrade Quay  Street, at a distance of 4.50 m from the main building NGC-1
  • Description: The storey of the NGC-1 building is P + 1; the gross area of ​​the building is 1902.78 m2 (pipe gallery 824.50 m2, ground floor 869.88 m2 and gallery 208.40 m2); the pumping station facility is used to store hydraulic and other accompanying equipment for the removal of bulky waste and wastewater and then, pumping into a specific recipient; wastewater enters the facility by a collector from Marka Miljanova Street; the water enters the inflow pool, passes through a coarse and fine grid and enters the sewage pumping station, from where, in the normal inflow, water is pumped into the discharge basin, and continues to gravity flow through the outlet collector in the Danube River. After the construction of the purifier, the water will be diverted to the purifier instead of to the Danube River.
  • Work Execution: The works are performed by a group of bidders, contractor “Energotehnika-Jučna Bačka” d.o.o. Novi Sad together with members of the group GP Graditelj NS  DOO  Novi Sad, “Tehnounion-Eksim” d.o.o. Sremska Kamenica and “Hidrovision” d.o.o. Belgrade;
  • Work Commencement: December 17, 2018, deadline 400 calendar days
  • Investor: Public Utility Company  “Vodovod i kanalizacija”, Novi Sad