CONSTRUCTION OF WASTEWATER TREATMENT PLANT IN BACKA TOPOLA
1. CONSTRUCTION OF LIDL RS RETAIL FACILITY IN BEČEJ
Site Location: Danila Kiša Street No 10a, Bečej Description: Construction of a retail facility according to the “turnkey” system. The Building has a ground floor with a total gross area of 2191.30 m², a total net area of 2056.27 m², a height of 6.90 m (5.90 m). The classification number of the facility is 123002, […]
WORKS ON CONSTRUCTION OF MISSING FACILITIES AT BORDER CROSSING NAKOVO
RECONSTRUCTION AND UPGRADE OF BREŠJE WATER TREATMENT PLANT IN ALEKSINAC
CONSTRUCTION OF WATER TREATMENT PLANT II WITH AUXILIARY WORKS IN SUBOTICA SWUP III
CONSTRUCTION OF NGC1- NEW MAIN PUMPING STATION NEAR ŽEŽEL’S BRIDGE (PHASE I) WITH ACCOMPANYING FACILITIES- TRANSFORMER STATION AND CONTROL COMMAND CENTER
INFRASTRUCTURE EQUIPMENT – LOCATION 19-2 (PETROL STATION CONNECTION to the EUROPE BOULEVARD)
RECONSTRUCTION AND REHABILITATION OF THE SEWERAGE SYSTEM ON THE NORTHERN PART OF PLOT 7569/1 OF THE CLINICAL CENTER OF VOJVODINA
CONSTRUCTION OF WASTE WATER TREATMENT PLANT IN BEGEČ
WORKS PERFORMANCE ON THE CONSTRUCTION OF THE INSTITUTE FOR EMERGENCY MEDICAL CARE IN NOVI SAD
PERFORMANCE OF WORKS ON RECONSTRUCTION AND UPGRADE OF WATER TREATMENT PLANT “BRESJE” IN ALEKSINAC
https://www.graditelj-ns.co.rs/wp-content/uploads/2018/01/bresje.mp4Description: reconstruction of existing facilities – distribution chambers, foculators and sedimentation tanks, filter galleries, administrative buildings; construction of new facilities – ozonation facility, floors P + 1, dimensions 21.43 × 9.8m in the base, total gross area 420m²; footbridges, with a gross area of 35.26 m2 connecting the ozonation facility with the existing facility-pipe gallery; […]