CONSTRUCTION OF WASTEWATER TREATMENT PLANT IN BACKA TOPOLA

BASIC INFORMATION ABOUT BUILDING:

Site Location:  Bačka Topola, left bank of the Krivaja watercourse

Description: Construction of Wastewater Treatment Plant in Backa Topola. The classification number of the facility is 126500, and  B category.

Construction includes:

  • pumping stations with a coarse grid
  • influent flow meter shaft
  • equalization basin
  • split shaft
  • SBR pool
  • channel flow meter
  • spout heads
  • static mixer
  • disinfection stations
  • gravitational sludge thickener
  • mechanical sludge dehydration and piece center
  • water meter shaft
  • bus station and drain shaft
  • roads and landscaping
  • pipeline (main collector inlet, thrust, inlet to the equalization basin
  • power installations WWTP
  • telecommunication and signal installations

 

Work Execution: January 2020; The works are performed by a group of bidders, contractor “Energotehnika-Jučna Bačka” d.o.o. Novi Sad together with members of the group GP Graditelj NS DOO Novi Sad, “Hidrovision” d.o.o. Belgrade and “Meris” d.o.o. Belgrade;

Investor: Municipality of Backa Topola – Municipal Administration