Construction of Collector II, Collector VII and Central main pipeline

BASIC INFORMATION ABOUT BUILDING:
  • Location: Subotica
  • WORK TYPE: CONSTRUCTION OF THE MAIN SEWERAGE COLLECTOR II AND VII AND THE MAIN CENTRAL WATER SUPPLY LINE
  • PIPE TYPE:
    • Ductile pipes Ø 1600mm / 1400mm / 300mm / 250mm
    • Polyester pipes: Ø 1600mm / 1400mm / 900mm / 700mm / 500mm
    • PVC pipes Ø 400mm / 315mm
  • ROUTE LENGTH:
    • Sewerage Collector approx 3700,0m
    • Central main pipeline approx 2700,0m
  • Work execution: 2015 god.
  • EMPLOYER: PUBLIC UTILITY COMPANY „Vodovod i kanalizacija“, Subotica / Donation from the European Bank for Reconstruction and Development