PROTECTION OF EXCAVATION PIT WITH GROUNDWATER LOWERING FOR A CEREAL SILOS FACILITY WITH ACCOMPANYING FACILITIES IN BEOCIN

BASIC INFORMATION ABOUT BUILDING:
  • Location: Beočin
  • Description: Construction pit protection and groundwater lowering
  • Work Execution: 2015
  • Employer: „Karin Komerc MD“, Veternik