Construction of Collector II, Collector VII and Central main pipeline

GraditeljNS 1:54 pm

Basic information about building:

  • LOCATION: Subotica
  • PROJECT: Subotica Water Upgrade Project 1 “Construction of Collector II, Collector VII and Central main pipeline, Subotica”
    • PIPES USED:
    • Ductile pipes Ø 1600mm/1400mm/300mm/250mm
    • Polyester pipes: Ø 1600mm/1400mm/900mm/700mm/500mm
    • PVC pipes Ø 400mm/315mm
  • THE PROJECT ROUTE LENGTH:
    • Sewerage Collector ~ 3.700m
    • Central main pipeline ~ 2.700m
  • CONSTRUCTION YEAR: 2015 god.
  • EMPLOYER: PUC “Vodovod i Kanalizacija”, Subotica / EBRD Loan

Construction phases: