UPGRADE OF THE MDS FACILITY – BASIC STRUCTURE (SUGAR FACTORY) IN PEĆINCI
9:50 am
okt2016.
October 2016
Extension of the MDS building – foundation structure AB MB30 V = 110.0 m2
Investor: “Sunoko” d.o.o., Novi Sad
October 2016
Extension of the MDS building – foundation structure AB MB30 V = 110.0 m2
Investor: “Sunoko” d.o.o., Novi Sad